These are the things that need to be done.

Internal:
1) remove current Cage, Dash, existing ABS brake lines.
2) Remove Alarm.
3) wire in kill switch and remote kill switch - might as well do a remote starter
4) Purchase hard brake lines and fittings (and oh, need tools to do the fittings) $$$
5) Fit Pedal Box and fit in the brake and clutch lines
6) Measure up seat brackets and fit seat brackets
7) remeasure bolts for cage and remount cage
8) clean up the interior (optional.. :-ppppp)

Engine:
1) Pull head and service head - change titanium retainers
2) fix chip on crank shaft key way (another story another day)
3) replace water pump, thermo stat, check oil pump pressure
4) Clean out sump and new seals
5) Clean out intake manifold and throttle body
6) Fit everything back together
7) Need a new turbo Manifold
- Probably need a new turbo as well but phhhtttt... can't afford it.

Transmission:
1) Fit MFactory Close ratios
2) Fit Mfactory Final Drive
3) Fit Mfactory Metal LSD
4) Fit MFactory twin plate clutch
5) mount trans to engine

A. Drop engine in

Aero:
1) fit rear diffuser
2) make and fit front splitter
3) Make and fit canards (optional)


Design:
1) Draw up some design for the car
2) Get the decals cut
3) Install